MILRADAR ← Live globe

NH90

ICAO NH90

Europe's multinational medium helicopter, built in two very different versions. Live NH90 positions.

A NH90 in flight
Photo © 安和すばる · planespotters.net
Airborne now
0
On the ground
0
Operators up
0
Highest

Flying right now

Live · 30s

No NH90 is transmitting ADS-B at the moment.
Military aircraft are not obliged to broadcast, so this happens regularly. The count refreshes every thirty seconds.

Airframe

Manufacturer
NHIndustries
Role
Medium transport and naval helicopter
Class
H2T — Helicopter, 2 turboshaft engines
Crew
2 to 4
First flight
18 December 1995
In service
2007

Operators airborne

Nothing of this type is up right now.

About the NH90

The NH90 was a four-nation attempt to build one medium helicopter for all of Europe, and it produced a genuinely advanced aircraft: fly-by-wire controls, a composite airframe and no mechanical linkage between stick and rotor at all. It also produced a procurement saga that several customers have described in unprintable terms.

Two versions share the name. The TTH is the army transport, and the NFH is the naval variant with folding rotors, a radar and anti-submarine equipment, operating from frigates across Europe and beyond.

France, Germany, Italy, the Netherlands, Belgium, Spain, Finland, Sweden, Norway, Greece, Qatar, Australia and New Zealand have all bought it. Australia retired its fleet early and Norway cancelled outright, which tells you something about how the programme went.

Callsign prefixes

CTM
Cotam — French Army Aviation
GAF
German Armed Forces
NAVY
Naval NFH operations

How to recognise it

  • A medium twin with a four-blade main rotor and a distinctly boxy, angular fuselage.
  • A rear ramp and a tall fin with the tail rotor mounted high on the left.
  • Naval versions have a folding tail and a radar radome under the nose.

Common questions

+ What is the difference between the NH90 TTH and NFH?

The TTH is the tactical transport for armies; the NFH is the naval frigate helicopter with folding rotors and tail, corrosion protection, search radar and anti-submarine equipment.

+ Why did some countries retire the NH90 early?

Availability and running costs. Australia withdrew its MRH-90 Taipans ahead of schedule in favour of the Black Hawk, and Norway cancelled its order and demanded repayment. Other operators have kept theirs and improved serviceability over time.

+ Who built the NH90?

NHIndustries, a consortium of Airbus Helicopters, Leonardo and Fokker, set up specifically for the programme by France, Germany, Italy and the Netherlands.

Related types